Search projects

Filter projects by markets or services

Client name: Iluka Resources

Location: Eneabba, Western Australia

Duration:  October 2020 – December 2021

Services provided:

  • SMP and Civil works
  • Pre-Feasibility study
  • 3D site model
  • Scopes of work vendor packages
  • Scopes of supply
  • Equipment data sheets

Eneabba Mineral Sands Recovery Project: Phase 2

Iluka Resources completed a Pre-feasibility Study (PFS) into phase 2 of the Eneabba Mineral Sands Recovery Project (EMSRP). The process includes conditioning, flotation, filtration and dewatering to produce two products: a high-grade 90% Monazite concentrate and a gravity concentrate consisting predominantly of Zircon and Ilmenite.

Tetra Tech Proteus delivered plans for a full engineering drawing, complete with supporting technical specifications and data sheets for all required packages. Details regarding nomination of all supply, fabrication, construction, installation and commissioning required by the client were also delivered by Tetra Tech Proteus. All works were commensurate with requirements of the project, current applicable legislation and industry best practice for a safe working environment, and also drafted with the intent to minimise disruption to existing operations.

 

No Comments

Sorry, the comment form is closed at this time.